chronos-plg

Project Status

Snapshot

This page separates implementation status from empirical status.

Capability Matrix

Area Engineering status Empirical status Notes
Data ingestion and contracts Implemented Mixed Core pipeline exists; some feature-family completeness remains a limitation
Leakage-safe evaluation Implemented Positive Test and protocol coverage are strong
Cost-aware backtesting Implemented Positive Central design strength of the repo
Baseline model stack Implemented Mixed EWMA shows life; LightGBM is weak in inspected public artifacts
Chronos candidate path Implemented Unresolved Infrastructure exists; public evidence remains weaker than EWMA-led evidence
Strategy and sizing layer Implemented Mixed Sensitive to threshold and regime assumptions
Robustness and kill criteria Implemented Positive Strong public differentiator; blocks premature promotion
Paper-trading governance Implemented Positive Readiness and ramp logic are present and active
Promotion readiness Implemented Negative No inspected candidate is promotion-ready yet

Findings Matrix

Evidence-positive

Evidence-negative

Unresolved